Nuclear’s Biggest Operator Shrugs Off the Blue Wave

Constellation Energy, the biggest nuclear plant operator in the US, isn’t buying the panic over a Democratic Congress. The Verge AI reports that CEO Joe Dominguez used the company’s third-quarter earnings call to brush off the post-election market reaction as “a bit of an overreaction.” That’s a bold call. Many newly elected Democrats ran on anti-data-center platforms, and the midterm results set off a record $2.5 trillion sell-off in AI-adjacent stocks. The losses spread well past tech into energy, construction and materials.

Why Dominguez isn’t worried

His case rests on jobs, not ideology. “The market scare that people got last week was not lost on Democrats,” he said. “They do not want to be the reason that the economy takes a nosedive by halting data center development.”

He pointed to Virginia and Illinois. Both had Democratic governors before the election, and both have seen “a great deal of data center development.” He also brought up labor. Data center construction brings a lot of union jobs, and labor is a core Democratic constituency.

You should take a CEO’s reassurance with some salt. Constellation’s future depends heavily on the data center buildout, and part of Dominguez’s job is calming investors. Still, The Verge AI notes that he seems genuinely unconcerned, and the politics support him more than the sell-off suggested.

This isn’t a clean partisan fight

Opposition to data centers doesn’t split neatly by party:

  • Some Democrats push back on hardline moves. Several have opposed harsh measures like moratoriums.
  • Some of the loudest critics are Republicans. Virginia state Sen. Richard Stuart, a conservative, has aggressively pursued data center regulation. Last month, Democratic Gov. Abigail Spanberger turned down his request for a special session on a state report showing strain on Virginia’s groundwater supply.
  • Washington wants to build. The Trump administration is strongly pro-data-center and is working to take some control over development away from the states.
  • There’s a bipartisan bill. The Bipartisan American Affordability and Jobs Act, co-sponsored by two Democrats, aims to speed up permitting for power plants and transmission lines and get data centers connected to the grid faster.

At the federal level, both parties mostly treat data centers as an inevitable part of the future that needs some guardrails. A full stop isn’t really on the table.

Who pays is the real fight

The real friction is over cost. Sen. Martin Heinrich highlights the bill’s provisions to protect utility customers from data-center-driven rate hikes. Researchers at Columbia University SIPA’s Center on Global Energy Policy called those protections “mixed.” They say the bill ignores wholesale capacity and energy prices, which they call a “principal way” data center demand raises household bills.

Senate Democrats are sharply divided. Critics warn the bill could fast-track projects at the expense of public input and environmental oversight, and lead to an overbuild of energy projects that ratepayers end up paying for. So far the backlash has been fragmented and local. That could change quickly if electricity bills become a national campaign issue.

Nuclear’s unlikely comeback

A few years ago, many of Constellation’s reactors were losing money and at risk of closing early. AI demand turned that around. Microsoft is funding the revival of a reactor at Three Mile Island, and Constellation signed major contracts in Q3 to power Amazon and Google data centers.

Nuclear has bipartisan support, and the Department of Energy classifies it as clean because running a reactor doesn’t directly emit carbon. That helps Big Tech balance aggressive buildouts against climate pledges made before the AI race took off. The waste problem remains unsolved, though. The US still has no way to dispose of nuclear waste at scale.

The next one to three years

Here’s where this is likely heading:

  1. Cost allocation becomes the main battleground. Expect more rules that make data centers pay for grid upgrades, plus closer scrutiny of wholesale power markets.
  2. Water and land move up the agenda. Virginia’s groundwater report is an early preview.
  3. Firm clean power gets scarcer and pricier. Existing nuclear fleets are hard to replace, and long-term deals like Microsoft’s will likely become the standard template.
  4. Federal vs. state fights heat up as Washington tries to override local resistance.

What to do now

  • If you plan compute capacity, treat power and location as real risks alongside chip supply. A cheap site in a state that’s turning against data centers can get expensive fast.
  • If you invest, separate headline risk from actual policy. Washington is debating guardrails, not shutdowns.
  • If you build AI products, watch energy costs. They’ll show up in cloud and inference pricing over time.

The next signal to watch is the Senate vote on the permitting bill. It’ll show whether build-with-guardrails really holds across party lines. The full story is at The Verge AI.

Scroll to Top